The large-scale deployment of battery electric trucks (BETs) requires well-developed charging infrastructure; however, existing planning approaches often neglect capacity constraints and the uncertainty inherent in microscopic charging behavior. This paper proposes a four-stage charging infrastructure planning methodology comprising energy analysis, single-vehicle Monte Carlo simulation, mixed-integer linear programming (MILP) optimization, and M/G/c post-calibration for long-haul highway freight transport. The method aims to achieve 100% flow capture by embedding path energy constraints into the MILP formulation and introducing peak-hour capacity constraints derived from queueing theory to address service instability. A case study demonstrates that the existing network without optimization is severely overloaded, achieving a capture rate of only 72.7%. Under the baseline scenario with 30% BET penetration, the optimized solution deploys eight charging stations. After station-level M/G/c calibration, the final configuration comprises 54 fast chargers and 271 slow chargers, representing a 33.8% reduction in total charger count compared to the initial MILP solution, effectively eliminating resource redundancy caused by the global capacity assumption. As the penetration rate increases to 60% and 100%, accompanied by technological progress, the required number of stations decreases to five, and the charging network evolves toward a “core node concentration” topology, with total costs exhibiting significant increasing returns to scale. This study provides a quantitative basis for zero-carbon freight corridor infrastructure planning and differentiated investment strategies.
The transition to net-zero emissions in freight transportation is essential for reducing the environmental impact of logistic operations. This paper addresses the design and evaluation of various deployment plans for battery swapping and charging stations at existing logistics facilities. These deployments aim to ensur...
Guan-Lin Chen, Yu-Jia Xu, Yin-Zhu Quan et al.· IISE Annual Conference &...· 0 citations
The objective of this paper is to address two design questions pertaining to aviation sustainability: First, how to design a solution for the establishment of a net-zero electric aircraft (EA) charging infrastructure for airports similar in size to Austin-Bergstrom International Airport (ABIA)? Second, what is an optim...
Lauren Cravy, Javier Guerrero, Alejandra Guardiola Garcia et al.· IISE Annual Conference &...· 0 citations
This paper presents a mixed-integer linear programming (MILP) framework for joint electric vehicle (EV) and electric bus (eBus) charging-infrastructure planning with photovoltaic (PV) self-consumption. The model co-optimizes charger siting, sizing, technology selection, eBus-to-depot assignment, and hourly charging sch...
Planning en-route charging and battery-swapping infrastructure for long-haul battery-electric trucks (BETs) requires models that reflect how trucks actually operate. This paper develops a mixed-integer programming framework that jointly sites charging or swapping stations and schedules each truck's charging, swapping a...
Urban ultra-fast-charging planning must connect equitable user service with physically deliverable charging power. This study formulates a heterogeneous graph linking demand zones, roads, candidate stations, and distribution buses, together with an infrastructure model for station locations, port-level power tiers, int...
Han Wu, Lu Shi, Xiao-Hang Gu et al.· World Electric Vehicle Journ...· 0 citations
The increasing penetration of electric vehicles (EVs) creates new challenges for coordinated planning of charging and battery-swapping infrastructure. This study aims to develop a joint location and capacity planning framework for electric vehicle charging stations (EVCSs) and electric vehicle swapping stations (EVSSs)...
Zi-Han Li, Bo Yang, Huanming Zhang et al.· Algorithms· 0 citations