AI-Enabled Performance-Based Procurement and Life-Cycle Maintenance of Highway Bridges: Integrating Single-Bid Risk Analytics and PPP Payment Optimization

Nov 2026 · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · 0 citations · 16 references

TL;DR

Model-based life-cycle evaluation indicates that AI-optimized PPP contracts reduce bridges reaching emergency condition by 30%–40% over a 30-year horizon while lowering life-cycle costs by 8%–12% compared with rule-based policies, providing infrastructure agencies and private concessionaires with an integrated AI-driven life-cycle management platform.

Abstract

Aging bridges, tight budgets, and procurement inefficiencies require a data-driven approach to maintenance contracts. Existing evidence shows that information and communication technology (ICT)–based construction management improves site productivity but remains unevenly adopted, a significant percentage of consultant tenders were single bid with systematically higher award rates, and public–private partnership (PPP) models for bridges that use Markovian deterioration modeling and performance-based payments can incentivize preventive maintenance, but they remain sensitive to prediction errors. Building on these strands, we propose an artificial intelligence (AI)–enabled framework that predicts the risk and cost impact of single-bid procurement, forecasts bridge condition trajectories using ICT-derived inspection and monitoring data, and optimizes PPP payment schemes for life-cycle cost, service level, and robustness. Empirically, a dataset of 8,000–10,000 design and supervision tenders and a bridge inventory of 820 highway bridges are combined. Gradient-boosted trees and deep neural networks will predict the probability of single-bid tenders and the associated award premium and multistep bridge condition transitions at 5-year intervals, using traffic, structural type, condition indices, and intervention history as features. A reinforcement learning–based design module searches performance indicators and payment curves to generate PPP schemes that minimize net present cost and bridges reaching the worst condition state while constraining downside risk via conditional value at risk. Model-based life-cycle evaluation indicates that AI-optimized PPP contracts reduce bridges reaching emergency condition by 30%–40% over a 30-year horizon while lowering life-cycle costs by 8%–12% compared with rule-based policies, providing infrastructure agencies and private concessionaires with an integrated AI-driven life-cycle management platform.

View source

Similar papers

Sep 2026

Automating Infrastructure Maintenance Contracting: A Hybrid Markov–Machine Learning Framework for Predictive Asset Management and Risk Financing

Uncertainty in infrastructure deterioration and maintenance cost forecasting continues to weaken the effectiveness of conventional maintenance contracts, contributing to budget overruns, delayed interventions, and inefficient risk allocation. This study develops a machine learning (ML)–enhanced adaptive performance-b...

Odey Alshboul, Ali Shehadeh · 0 citations
Open access Jul 2026

Digital Technologies for Sustainable Highway Maintenance Governance: Evidence from a Scientific Maintenance Pilot in China

Sustainable highway maintenance is increasingly important as road agencies face ageing assets, fiscal constraints and growing requirements for service reliability and resilience. Although digital technologies are widely used in inspection, prediction and construction control, less is known about how they support govern...

Ran Huang, Guoping Yuan, Jingxian Wang · 0 citations
Open access Jul 2026

From Contract Amendments to Risk-Calibrated Duration Multipliers: A Statistical Framework for Realistic Construction Contract Planning

Construction contract durations are fixed during procurement, yet delivery often changes after risks materialize and formal extensions of time are approved. Although delays, extension-of-time claims, change orders, and risk-based duration estimation are well studied, less is known about how contract-amendment records c...

Mariela Knezevic, Domagoj Knezevic, Časlav Dunović · 0 citations
Review Open access Jul 2026

PROBABILITY-BASED RISK IN BUILDING PROJECTS: A MULTIDIMENSIONAL SYSTEMATIC REVIEW ACROSS RISK TYPES, PROJECT STAGES, AND BUILDING USES

Probabilistic risk management has become central to delivering safer and more resilient building projects under growing cost, schedule, and sustainability pressures. This study synthesizes how probability-based approaches have been applied in building-related risk research and identifies unresolved gaps that limit thei...

Dariyono, Oei Fuk Jin Oei Fuk Jin · 0 citations
Open access Jul 2026

Decoupling Safety Stock and Replenishment Decisions: A Data-Driven Hybrid Risk-Value Framework for Resilient Industrial Inventories

Background: Traditional value-based ABC inventory classification allocates protection according to economic value, overlooking operational risk factors such as demand variability, lead time, and assembly criticality, and it couples safety-stock and replenishment-cycle decisions. Methods: We propose a Hybrid Risk-Value...

Leonardo G. Hernández Landa, Carolina Solís Peña, Juan M. Hernández Ramos et al. · 0 citations
Open access 2026

Multi-level SLI/SLO model for critical financial infrastructure: linking technical metrics to business scenarios

The reliability of critical financial infrastructure has become a strategic imperative as digital payment platforms, central bank digital currencies (CBDCs), and real-time settlement systems expand globally. This article investigates the theoretical foundations and practical application of a multi-level Service Level I...

Natallia Kalivoshka · 0 citations