Nov 2026· Journal of Legal Affairs and Dispute Resolution in Engineering and Construction· 0 citations· 16 references
TL;DR
Model-based life-cycle evaluation indicates that AI-optimized PPP contracts reduce bridges reaching emergency condition by 30%–40% over a 30-year horizon while lowering life-cycle costs by 8%–12% compared with rule-based policies, providing infrastructure agencies and private concessionaires with an integrated AI-driven life-cycle management platform.
Abstract
Aging bridges, tight budgets, and procurement inefficiencies require a data-driven approach to maintenance contracts. Existing evidence shows that information and communication technology (ICT)–based construction management improves site productivity but remains unevenly adopted, a significant percentage of consultant tenders were single bid with systematically higher award rates, and public–private partnership (PPP) models for bridges that use Markovian deterioration modeling and performance-based payments can incentivize preventive maintenance, but they remain sensitive to prediction errors. Building on these strands, we propose an artificial intelligence (AI)–enabled framework that predicts the risk and cost impact of single-bid procurement, forecasts bridge condition trajectories using ICT-derived inspection and monitoring data, and optimizes PPP payment schemes for life-cycle cost, service level, and robustness. Empirically, a dataset of 8,000–10,000 design and supervision tenders and a bridge inventory of 820 highway bridges are combined. Gradient-boosted trees and deep neural networks will predict the probability of single-bid tenders and the associated award premium and multistep bridge condition transitions at 5-year intervals, using traffic, structural type, condition indices, and intervention history as features. A reinforcement learning–based design module searches performance indicators and payment curves to generate PPP schemes that minimize net present cost and bridges reaching the worst condition state while constraining downside risk via conditional value at risk. Model-based life-cycle evaluation indicates that AI-optimized PPP contracts reduce bridges reaching emergency condition by 30%–40% over a 30-year horizon while lowering life-cycle costs by 8%–12% compared with rule-based policies, providing infrastructure agencies and private concessionaires with an integrated AI-driven life-cycle management platform.
Uncertainty in infrastructure deterioration and maintenance cost forecasting continues to weaken the effectiveness of conventional maintenance contracts, contributing to budget overruns, delayed interventions, and inefficient risk allocation. This study develops a machine learning (ML)–enhanced adaptive performance-b...
Odey Alshboul, Ali Shehadeh· Journal of Infrastructure Sy...· 0 citations
Sustainable highway maintenance is increasingly important as road agencies face ageing assets, fiscal constraints and growing requirements for service reliability and resilience. Although digital technologies are widely used in inspection, prediction and construction control, less is known about how they support govern...
Ran Huang, Guoping Yuan, Jingxian Wang· Sustainability· 0 citations
Construction contract durations are fixed during procurement, yet delivery often changes after risks materialize and formal extensions of time are approved. Although delays, extension-of-time claims, change orders, and risk-based duration estimation are well studied, less is known about how contract-amendment records c...
Probabilistic risk management has become central to delivering safer and more resilient building projects under growing cost, schedule, and sustainability pressures. This study synthesizes how probability-based approaches have been applied in building-related risk research and identifies unresolved gaps that limit thei...
Dariyono, Oei Fuk Jin Oei Fuk Jin· Jurnal Teknik Sipil dan Arsi...· 0 citations
Background: Traditional value-based ABC inventory classification allocates protection according to economic value, overlooking operational risk factors such as demand variability, lead time, and assembly criticality, and it couples safety-stock and replenishment-cycle decisions. Methods: We propose a Hybrid Risk-Value...
Leonardo G. Hernández Landa, Carolina Solís Peña, Juan M. Hernández Ramos et al.· Logistics· 0 citations
The reliability of critical financial infrastructure has become a strategic imperative as digital payment platforms, central bank digital currencies (CBDCs), and real-time settlement systems expand globally. This article investigates the theoretical foundations and practical application of a multi-level Service Level I...
Natallia Kalivoshka· International Journal Of Eng...· 0 citations
Related blog posts
MIT News · Artificial Intelligence· news.mit.eduOct 13, 2026
Machine-learning networks can learn without detailed instructions from a designer. Those that do may offer insight into how the brain reorganizes itself during learning.