Oct 2026· International Journal of Engineering and Modern Technology· 0 citations
Abstract
Construction risk management depends not only on the availability of project information but
also on its accuracy, timeliness, relevance and manageability. In digitally connected project
environments, excessive, incomplete or misleading information may distort risk identification
and delay mitigation decisions. This study examines information and decision quality as a
risk-mitigation capability in construction projects in Bauchi Metropolis, Nigeria. The
analysis draws on a cross-sectional survey of construction professionals in Bauchi
Metropolis and focuses specifically on ten risk-management items measured on a five-point
Likert scale. Descriptive statistics, combined agreement rates and mean-score ranking were
used, while a post-hoc thematic grouping distinguished information-quality enablers from
information-risk amplifiers. The results show a consistently high information dependency in
risk management (overall mean of item means = 4.39; average agreement = 89.91%).
Accurate information was ranked highest as a prerequisite for effective risk management (M
= 4.51), closely followed by reliance on accurate and timely data for mitigation decisions (M
= 4.50). Information mismanagement, misinformation, incomplete data, poor information
flow and information overload were also strongly associated with incorrect risk
identification, increased uncertainty and weak prioritisation. The study concludes that
information and decision quality should be treated as an explicit risk-control capability
rather than a routine communication issue. A governance pathway based on source
authority, verification, filtering, structured information environments and risk-linked
information protocols is proposed for construction organisations in emerging markets.
Operational efficiency is important to road construction companies because it reflects firms’ capacity to use resources economically, complete projects promptly, deliver services effectively and meet client quality requirements. This study examined the relationship between risk assessment and operational efficiency of...
E. K. Kirui, J. Oluoch, E. Kimani et al.· International journal of res...· 0 citations
The study investigated the relationship between risk management practices and construction project performance and assessed the predictive relationship between risk mitigation strategies and project performance in Nigeria. The study employed a quantitative research design using a cross-sectional survey approach. The st...
Akanni Prince Oluleye, Oni Samuel Oluwaseyi, Obasanjo James· International journal of re...· 0 citations
The upstream oil and gas industry faces complex strategic, operational, financial, and governance risks, making mature risk management essential for organizational resilience and decision-making. This study aims to determine the priority weights of Risk Management Maturity (RMM) indicators and Risk Governance aspects a...
R. Prakoso, A. R. Pudyantoro, A. Rozamuri· American Journal of Economic...· 0 citations
Risk assessment and management (RAM) tools are central to shutdown and turnaround maintenance (STAM), but frequent use does not necessarily demonstrate implementation quality or safety effectiveness. This cross-sectional study analysed respondent-level survey data from 148 STAM professionals in a Nigerian upstream petr...
K. Ekpo, E. Esitikot, Akaninyene Edet Ekong et al.· International Journal of Lat...· 0 citations
Project risk management involves a systematic approach to planning, identifying, analysing and responding to potential risks throughout project implementation. This study iaims to identify, evaluate and develop appropriate risk reduction strategies for the Slinga Kiri Irrigation Area project in Purbalingga Regency. In...
S. Putri, N. Purwono, Diyah Ayu Widayanti· Jurnal PenSil· 0 citations
Large-scale infrastructure projects in developing countries remain highly exposed to uncertainty, and inadequate risk management continues to contribute to delays, cost overruns and quality shortfalls. This study evaluates risk management practices on the Lagos–Ibadan Motorway reconstruction project in Nigeria, focusin...