Fuzzy 5D multi objectives optimization of construction planning using game theory for automated time cost quality resource and workspace resolution

Aug 2026 · Journal of Engineering, Design and Technology · pp. 1-20 · 0 citations · 40 references

TL;DR

A five-dimensional optimization framework to resolve spatial and resource conflicts in construction scheduling that provides an automated mechanism to secure balanced, mathematically fair schedules, mitigating the operational risks of trade stacking and severe resource peaks.

Abstract

This study aims to develop a five-dimensional (5D) optimization framework to resolve spatial and resource conflicts in construction scheduling. By integrating resource leveling and workspace congestion with the traditional time, cost and quality objectives, the research addresses the critical gap between theoretical scheduling models and practical site feasibility. The framework uses triangular fuzzy numbers to model uncertainties in activity durations and costs. A Nondominated Sorting Genetic Algorithm III (NSGA-III) generates a comprehensive Pareto front for a complex highway interchange. To eliminate subjective bias in schedule selection, the methodology integrates cooperative game theory. An entropy-weighted nash Bargaining mechanism automatically evaluates the competing objectives to identify the optimal compromise. The application of this framework demonstrates that integrating spatial and resource constraints substantially alters optimal execution paths. The Nash-derived schedule reduced spatial conflicts by nearly 38%, duration by 6.53%, and cost by 8.42% compared to standard practices. Variance analysis across 30 independent runs confirmed the statistical significance of these improvements, proving the model consistently outperforms conventional single-objective and multi objective baselines. The primary contribution is a data-driven workflow that objectively resolves high-dimensional stakeholder conflicts. By leveraging game-theoretic principles, the framework provides an automated mechanism to secure balanced, mathematically fair schedules, mitigating the operational risks of trade stacking and severe resource peaks.

View source

Similar papers

Dec 2026

Automated Decision Intelligence Framework for Infrastructure Project Scheduling via Seven-Dimensional Many-Objective Evolutionary Optimization and OPA-TOPSIS Ranking

The management of complex infrastructure projects necessitates the simultaneous optimization of multiple competing objectives beyond the traditional time, cost, and quality triangle. This study proposes a seven-dimensional multiobjective scheduling framework integrating duration, cost, quality, resource leveling, env...

A. Mohy · 0 citations
Open access Oct 2026

An intelligent multi-objective decision framework for Time–Cost–Quality optimization in construction scheduling using AHP and OBL–NSGA-III

Construction scheduling requires simultaneous optimization of project time, cost, and quality; however, most existing time–cost trade-off (TCTO) models inadequately incorporate construction quality as a quantitative optimization objective. This study proposes an intelligent hybrid decision framework that integrates the...

G. Murthy, R. Prasad, A. Venkatakrishna et al. · 0 citations
Open access Sep 2026

Multi-Objective Optimization with Fuzzy Demand for Integrated Facility Location and Dynamic Relief Response: Toward Balancing Cost and Efficiency

This paper studies the integrated facility location and dynamic relief response problem by developing a multi-objective optimization model with fuzzy demand that simultaneously optimizes the facility location cost and the total rescue cost, thereby balancing cost and efficiency. An optimal relief plan involves decision...

Bo-Yuan Yang · 0 citations
Open access 2026

A Fuzzy Multi-Criteria and Cooperative Game-Theoretic Framework for Strategic Planning of Real-Time Adaptive On-Demand Public Transportation Systems

Compared with a traditional fixed-route system, a demand-responsive transit system can respond to fluctuating demand and thereby avoid inefficiencies that would arise from traffic congestion. Yet there are several obstacles to the practical application of the approach. Objective: This paper develops a strategic decisio...

S. B. Razavian, Andrés Rodríguez Gutierrez, Luigi Dell'olio et al. · 0 citations

Reinforcement learning for sustainable construction scheduling: a many-objective framework with adaptive search and multi-criteria decision support

Delivering construction projects sustainably requires reconciling duration, cost, carbon emissions and the stability and utilization of site resources, yet these objectives conflict and the choice among candidate schedules is seldom made on an explicit, data-driven basis. This study aims to develop a data-driven de...

A. Mohy, Haytham Sanad · 0 citations
Open access Sep 2026

A Preference-Driven NSGA-III Using Fuzzy AHP for Multiobjective Wind Farm Layout Optimization

Wind farm layout optimization (WFLO) requires balancing energy production against infrastructure requirements while providing decision-makers with a defensible method for selecting Pareto-optimal alternatives. This study proposes a preference-guided NSGA-III framework integrated with the Fuzzy Analytic Hierarchy Proces...

Robaya Alsabhan, M. Ramli, M. Rawa · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.