Critical Success Factors, Risk Allocation, and Schedule Planning in Major Infrastructure Projects: A Structural Equation Modeling Analysis

Aug 2026 · Natural Resources for Human Health · 0 citations · 40 references

Abstract

There are usually cost and time issues, and problems with quality, with big infrastructure projects. This paper analyses the impact of governance and leadership capacity, technical and organizational capability, stakeholder alignment, quality of risk management, and maturity of schedule management on operational project performance, using the structural equation modeling technique. The analysis was performed on an anonymized dataset with 400 project observations across six regions, six infrastructure sectors, five delivery models and eight professional roles. Reflective measurement blocks were studied based on standardized loadings, Cronbach’s alpha, composite reliability, average variance extracted and the heterotrait-monotrait ratios. Operational project performance combined several perceptual measures and objective measures including schedule and cost performance indices, delays, cost overruns, change orders, safety incidents, and variance in critical path. The analysis showed that governance and leadership capacity positively predicted the quality of risk allocation (β = .485), and that technical and organizational capability positively predicted the maturity of schedule planning (β = .433). The quality of risk allocation (β = .319), and the maturity of schedule planning (β = .275), positively predicted operational performance, with the model explaining 68.1% of the variance. Stakeholder alignment did not have a significant direct effect on operational performance (β = .028, p = .456); however, an indirect effect through the quality of risk allocation was observed, along with governance, leadership and technical capacity, with partial mediation. The size, duration and complexity proxy did not have a significant moderating effect on the relationship between quality of risk allocation and performance, or maturity of schedule planning and performance. The evidenced pathways support the development of a practice-based risk allocation and schedule management framework based on the following concepts: an edge in management and control, absorption and use of relevant information, clarity with respect to the value of contingencies, and governance of P50/P80 milestones.

View source

Similar papers

Open access Aug 2026

Analysis of Risk Management Maturity and Risk Governance Using AHP: A Case Study at Pt Pertamina Hulu Energi for the 2020–2025 Period

The upstream oil and gas industry faces complex strategic, operational, financial, and governance risks, making mature risk management essential for organizational resilience and decision-making. This study aims to determine the priority weights of Risk Management Maturity (RMM) indicators and Risk Governance aspects a...

R. Prakoso, A. R. Pudyantoro, A. Rozamuri · 0 citations
Open access 2026

The role of project finance audits, project quality management, and environmental, social, and governance (ESG) practices on corporate sustainability

The main objective of this study is to analyze and examine the influence of project financing audits, project quality management, and environmental, social, and governance (ESG) practices on corporate sustainability. This study seeks to determine the extent to which governance mechanisms and project implementation qual...

Hamilah Hamilah, Tikkos Sitanggang, Sandro Prawiro Hutagalung · 0 citations
Open access Sep 2026

The Impact of Strategic Infrastructure Management on Organizational Success: The Mediating Role of Project Management Efficiency in selected Cities of Saudi Arabia

This study investigated the effect of strategic infrastructure management on organizational success in selected Saudi Arabian cities, considering project management efficiency as a mediating variable. Although Saudi Vision 2030 has encouraged major infrastructure investments, many organizations still experience delays,...

Hadyan Al Dawsari, Abdoul Rahman Mhd Al Jounaidi · 0 citations
Review Open access Sep 2026

Towards an Effective Risk Management Framework for Large-Scale Infrastructure Projects

Large-scale infrastructure projects (LSIPs) frequently exceed budgets and schedules despite the accessibility or the adoption of risk management frameworks (RMFs). This study addresses or discusses two gaps: the lack of triangulated evidence on why structurally sound frameworks such as ISO 31000 and PMBOK remain proced...

Fairooz Ferdous, Mickael Sassine, A. Saravana et al. · 0 citations
Review Open access Sep 2026

The relationships between multidimensional construction project risk exposure and overall risk-control strategy effectiveness in Oman: a quantitative PLS-SEM study

This paper reports exclusively the quantitative phase of a broader study examining relationships between multidimensional construction project risk exposure and overall risk-control strategy effectiveness in Omani construction projects. Construction Project Risk Exposure was conceptualized as an overarching domain comp...

Rashid Salim, S. Norhisham, M. Z. Ramli et al. · 0 citations
Open access Sep 2026

The Grey Relational Analysis (GRA) method in Embedded Systems Design: A Suitable Approach for Multi-Criteria Decision Making

This research examines the significance of management functions—Planning, Organizing, Directing, Controlling, and Commitment—in optimizing organizational resources, including Management, Money, Marketing, Manpower, and Material. Grey Relational Analysis (GRA) is used to quantitatively evaluate the relationship between...

Sathishkumar · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.