Sep 2026· Frontiers in Energy Research· 0 citations· 29 references
Abstract
High penetration of distributed energy resources and uncertain loads creates financial and operational challenges for distribution networks. To address these challenges, this paper proposes a risk-averse, two-stage stochastic coordination framework for a distribution network interacting with the main grid. The day-ahead stage determines the procurement schedule, whereas the real-time stage corrects deviations through real-time market transactions and demand response (DR) mobilization. DR availability is explicitly modeled as scenario-dependent uncertainty. The physical network is formulated using a second-order cone programming (SOCP)-relaxed branch-flow model, which enables an exact mathematical decomposition of distribution locational marginal prices (DLMPs). A Conditional Value-at-Risk (CVaR) metric is integrated to manage extreme tail-risk penalties. Simulations on the IEEE 33-bus system show that the proposed framework reduces the expected daily power shortage by over 10% compared with the risk-neutral baseline. Stronger risk aversion leads to more conservative day-ahead procurement. This forward over-procurement reduces expected real-time marginal scarcity, decreases the expected reliance on local DR during most hours, and dampens absolute DLMP levels at high-priced downstream nodes over a large portion of the operating horizon. These results indicate that tail-risk management reshapes both real-time flexibility utilization and localized economic signals in distribution networks.
This paper studies a risk-averse stochastic unit commitment framework for an energy aggregator, operating a portfolio of conventional generators, renewable units, and battery energy storage in a network-constrained environment. Renewable generation and demand uncertainty are represented through a scenario-based extensi...
Pande Popovski, Goran Veljanovski, M. Atanasovski et al.· Energies· 0 citations
This paper investigates distribution network reconfiguration under demand uncertainty using a two-stage stochastic formulation. The network topology is selected in the first stage, whereas the electrical variables are determined separately for each scenario. The deterministic equivalent is formulated as a MISOCP proble...
This paper presents a novel master–slave stochastic optimization framework for the optimal siting and sizing of fixed-step capacitor banks in medium-voltage distribution networks, explicitly addressing the inherent variability of load demand that is typically neglected in conventional deterministic approaches. The prop...
O. Montoya, L. Grisales-Noreña, J. Sánchez-Céspedes· Electricity· 0 citations
Battery Energy Storage Systems (BESS) operators face significant challenges when participating in multiple electricity markets due to the complex coupling of price volatility and stochastic reserve activation. Traditional deterministic dispatch models neglect the"tail risks"associated with extreme market realizations,...
Younes Zahraoui, Jun Cao, Samir Kouro et al.· 0 citations
Demand response (DR) can relieve source-load imbalance in microgrids (MGs), but its practical scheduling value is limited by renewable uncertainty and uncertain user response behavior. This paper proposes a coordinated day-ahead/intraday scheduling framework that combines multi-scenario risk scheduling with fuzzy chanc...
Fu-Rong Tu, Su-Mei Zheng, Hong-Chao Wang et al.· Frontiers in Energy Research· 0 citations
High renewable penetration exacerbates source-load uncertainty in power systems, with coupled stochastic variables further straining supply-demand balance. Addressing limitations in multi-source uncertainty correlation modeling, probabilistic flexibility assessment, and multi-time-scale scheduling coupling, this work p...
Zhi-Qi Xu, Hai-Bo Zhang, Chun-Yang Fan et al.· 2026 6th Power System and Gr...· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.