Planning and Scheduling Business Processes under Control-Flow Uncertainty: Extended Version

Sep 2026 · 0 citations · 15 references
Computer Science

TL;DR

A decomposed approach with two stages, a planning stage that minimizes the expected number of superfluous activities subject to a feasibility constraint, and a scheduling stage that minimizes the makespan over the planned activities; and an integrated approach that combines planning and scheduling into a single formulation.

Abstract

Scheduling activities in business processes can improve efficiency (e.g., reduce makespan), but is challenging because the exact sequence of activities required to complete a case is often uncertain due to decisions based on data that emerges during execution. Nevertheless, probabilistic information regarding such decisions can often be estimated or derived from historical execution logs, and can help anticipate which execution paths are likely to lead to successful completion. Planning with particular execution paths affects feasibility, i.e., the probability of successful completion, and the expected number of superfluous activities that are planned but never executed. We frame the problem as a chance-constrained optimization problem and present two formulations: A decomposed approach with two stages, a planning stage that minimizes the expected number of superfluous activities subject to a feasibility constraint, and a scheduling stage that minimizes the makespan over the planned activities; and an integrated approach that combines planning and scheduling into a single formulation. Evaluation on two real-world and one synthetic dataset shows that the integrated approach yields superior makespans but is intractable at scale, while the decomposed approach scales to large settings.

View source

Similar papers

Open access Sep 2026

Cost-aware task sequencing with flexible time windows

Classical scheduling methods are generally designed to optimize a single objective, such as minimizing completion time or the number of delayed jobs. However, practical production environments are frequently characterized by multiple and often conflicting objectives, including delivery performance and economic consider...

Péter Veres, Zoltán Baráth, Cajner Hrvoje · 0 citations

Optimizing turnaround maintenance execution : a unified framework for constraint management and simops control – a case study in a Thai petrochemical plant

Turnaround Maintenance (TAM) is vital for petrochemical plant reliability and safety; however, shutdown execution is high-risk, resource-intensive, and frequently subject to schedule overruns. Area supervisors must manage emergent work, delays, and overlapping tasks while complying with strict safety governance. Conven...

Ayut Yokyongsakul · 0 citations
Conference Aug 2026

Scheduling Method of Robotic Flexible Flow Shops based on Petri Nets and Masked-PPO

With the rapid development of the smart industry, robotic flexible flow-shop (RFFS) has been widely adopted in intelligent manufacturing systems due to its strong capability to support customized, multi-variety, and small-batch production modes. To enhance both solution quality and computational efficiency in addressin...

Xiao-Juan Yin, Bo Xu, Tian Jiang et al. · 0 citations