Project Planning and Performance of Road Construction Projects: Evidence from Kenya National Highways Authority in Kenya’s South Rift Region
Abstract
The study conceptualized project initiation, project planning, project execution and project monitoring and control as the independent variables, while project performance was the dependent variable. Project performance was operationalized as a multidimensional construct. Pearson correlation and regression analysis were used to establish the individual and combined relationship between the four independent variables and project performance. The study was motivated by persistent challenges in road construction project delivery, including delays, cost overruns and failure to achieve planned outputs. A positivist research philosophy and a descriptive and correlational research design were adopted. The study employed a quantitative approach, with primary data collected using structured questionnaires. Data were analysed using descriptive statistics, Pearson correlation and regression analysis. Descriptive findings indicated that project planning practices had been well implemented, with a mean score of 3.90 (SD = 1.12). Risk assessment before implementation recorded the highest mean (M = 4.02), while documentation and sharing of implementation plans recorded the lowest mean (M = 3.68). Inferential findings established a strong positive and statistically significant relationship between project planning and project performance (r = 0.720, p < 0.001). The regression model indicated that project planning explained 51.8% of the variation in project performance (R² = 0.518). The analysis of variance established that the regression model was statistically significant, F(1,115) = 123.55, p < 0.001. Regression results showed that project planning had a positive and statistically significant influence on project performance (β = 0.720, t = 11.116, p < 0.001). The null hypothesis that project planning had no statistically significant influence on project performance was rejected. The study concluded that effective project planning contributed to improved performance of road construction projects. The study recommended that KeNHA strengthen project planning practices through realistic scheduling, effective resource allocation, comprehensive risk assessment, regular review of plans and enhanced stakeholder coordination.