Skip to content
Conference Open access

Retrofitting existing masonry buildings to passive house standards: Challenges and technical solutions

2026 · Zbornik radova · 0 citations · 7 references

Abstract

The renovation of the existing building stock is essential for reducing energy consumption and improving indoor environmental quality. Retrofitting existing masonry buildings to high energy-performance standards is particularly challenging because energy-efficiency measures must be adapted to the characteristics of the existing building fabric, moisture behaviour, architectural constraints, and technical feasibility. This paper presents a structured analytical review of the main technical challenges and retrofit measures associated with the application of Passive House principles to existing masonry buildings. Relevant scientific and professional literature was comparatively analyzed and organized according to the principal retrofit measures and their reported effects on building performance. The analysis considers improvements to the thermal envelope, thermal bridge reduction, airtightness, high-performance windows and doors, controlled ventilation with heat recovery, solar control, moisture management, and efficient domestic hot water systems. A criterion-based qualitative framework is used to synthesize the relative contribution of these measures to energy efficiency, thermal comfort, indoor air quality, moisture protection, and building durability. The results indicate that the effectiveness of individual measures depends strongly on their interaction with other retrofit interventions and on the characteristics of the existing building. Continuous insulation, thermal bridge reduction, airtightness, high-performance openings, and mechanical ventilation with heat recovery form the core of an integrated high-performance retrofit strategy, while moisture management represents a cross-cutting requirement. The study provides a structured synthesis of the main technical relationships, performance contributions, and implementation constraints reported in the literature. It concludes that substantial improvements can be achieved through an integrated, building-specific approach, whereas the feasibility of attaining the full Passive House standard should be assessed individually for each existing masonry building.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.