Aug 2026· World Journal of Advanced Research and Reviews· Vol 31, pp. 1581-1590· 0 citations
Abstract
Accelerated restoration requires reliable performance information because deviations can compound quickly under compressed schedules and constrained operating conditions. This study examined the relationship between performance measurement practices and accelerated electrical infrastructure recovery performance in a remote setting. An explanatory sequential mixed-methods case design was used. All 150 eligible personnel were invited to participate; 114 directly involved participants provided complete and usable questionnaires, and eight key informants contributed explanatory interview data. Performance measurement recorded high agreement (M = 3.97, SD = 1.00) and had a very strong positive association with respondent-rated recovery performance (r = .724, p < .001). Performance data for operational adjustment recorded the highest indicator mean (M = 4.04), whereas definition of indicators at project commencement recorded the lowest (M = 3.80). The qualitative findings showed that performance measurement improved visibility of completed work, delayed activities, constraints, priorities, and required interventions. The study concludes that performance measurement supports accelerated recovery when information is timely, decision-oriented, traceable to approved targets, and adapted to the restoration context.
- Large institutional campuses — academic, research, industrial and township — behave as small cities, aggregating electrical distribution, water supply and pumping, HVAC, fire protection, security, transportation, medical facilities and, increasingly, communication networks and data centers into a single operational e...
Rajendra Prasad N, Srilatha Kalvacherla· Iconic research and engineer...· 0 citations
This paper examines how performance variability and non-technical skills enabled safe adaptation during a high-risk offloading operation between an FPSO and a shuttle tanker. The Functional Resonance Analysis Method (FRAM) was applied to compare Work-As-Imagined (WAI), based on procedures and standards, with Work-As-...
J. França, E. Hollnagel· SPE Annual Technical Confere...· 0 citations
The increasing deployment of renewable-energy installations in tertiary institutions has created opportunities for improving electricity availability, reducing dependence on conventional power sources and supporting sustainable campus development. However, the effectiveness of such installations depends on electrical s...
G. C. Achakpo, M. U. Disina, M. N. Achakpo et al.· International Journal of Eng...· 0 citations
Electrical distribution failures in industrial facilities threaten workers, equipment and continuity of production. Arc-flash severity cannot be controlled through hazard labels or personal protective equipment alone: it is shaped by prospective short-circuit conditions, protective-device operating times, equipment con...
Abubakar Moosa Shaikh· Iconic research and engineer...· 0 citations
The reliability and availability of modern electric multiple units (EMUs) are essential for ensuring safe, efficient, and sustainable railway transport. This research presents an analysis of the maintenance process, failure characteristics, and operational availability of Stadler FLIRT 413/417EMUs operating on the Serb...
Katarina Hristodulu, Orcid Not Stated In The Paper Jovan Tanasković· Proceedings· 0 citations
Purpose: This study examines how chronic electrical power instability in Kinshasa affects the operational safety of CBRN laboratories and the reliability of epidemiological surveillance data. It reframes power instability not as a technical infrastructure problem alone, but as a management and governance failure that u...
Robert Kumandum Mukomo, Fiston Masikini Bombamu, Paul M'Pong et al.· International Journal of Sci...· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.