Skip to content
Open access

STOCHASTIC MODEL OF CAPACITY TYPE RESOURCE ALLOCATION

2026 · Bulletin of the South Ural State University. Ser. Computer Technologies, Automatic Control & Radioelectronics · Vol 26, pp. 89-102 · 0 citations

Abstract

Purpose of the study. The problem of forming a project team to complete tasks of a given complexity within a specified timeframe and with minimal costs is considered. The productivity of each specialist is modeled as a random variable obeying a normal distribution, which leads to the formulation of a stochastic programming problem with a probabilistic constraint. Materials and Methods. The main attention is paid to methods of reducing a stochastic problem to a deterministic equivalent by transforming a probabilistic constraint using the properties of the normal distribution law. This operation allows us to reduce the original problem to a nonlinear form. This circumstance excludes the use of well-tested algorithms. The main complexity of the solution lies in the nonlinearity and integer nature of the variables. Constraint linearization methods, including Taylor series expansion and piecewise linear approximation, are studied, and simple heuristic selection criteria are analyzed. The proposed main solution method is to linearize the nonlinear constraint obtained by transitioning from a probabilistic constraint in linear form to a deterministic version, but in nonlinear form. The paper describes approaches to nonlinear constraint linearization, including Taylor series expansion and piecewise linear approximation. Results. Heuristic criteria for selecting specialists are proposed, taking into account their productivity, cost and labor stability. Four criteria are introduced: an efficiency criterion using two characteristic parameters: productivity and cost; a stability criterion taking into account the standard deviation and productivity; a complex criterion, which is the product of the first two; and a combined criterion taking into account all three factors. The advantages and disadvantages of these approaches to solving the original problem are shown. Conclusion. It is shown that taking into account the stochastic nature of individual initial parameters of the problem leads to the need to solve optimization problems of stochastic programming, which presents certain difficulties. In this case, the focus is no longer on obtaining analytical solutions. A practical example demonstrates that accounting for stochasticity leads to increased team size and costs compared to a deterministic case. A conclusion is drawn regarding the need to use combined criteria and iterative algorithms to obtain solutions close to optimal.

Read PDF

Similar papers

Open access Sep 2026

Optimal economic lot schedules with lost demand

This paper presents a~new mathematical programming model for the economic lot scheduling problem (ELSP) with a common cycle for all products. The proposed model takes into account lost demand when capacity is insufficient or when set-up and inventory holding costs are too high. Two cases are modeled. In the first case,...

Waldemar Kaczmarczyk · 0 citations
Preprint Nov 2026

A Solution Method for Single-Source Capacitated Facility Location Problems Under Decision-Dependent Demand Uncertainty

We present a model and an exact solution method for single-source capacitated facility location problems with decision-dependent demand uncertainty. The model allows the joint probability distribution of customer demands to depend on the facility to which demand points are allocated. The number of possible decision-dep...

Giovanni Pantuso, M. Lejeune · 0 citations
Preprint Sep 2026

Sample average approximation of multiobjective stochastic optimization problems with application in insurance

The article describes a technique for solving multiobjective stochastic optimization problems. As a generalized model of a stochastic system to be optimized a vector (input-random output) system is used. Ran- dom outputs are converted into a vector of deterministic performance and risk indicators. The problem is to fin...

B. Norkin · 0 citations
Preprint Oct 2026

Dynamic Control of a Make-to-Order Manufacturing System under Throughput Time Constraints: An Effective Computational Method in the High-Dimensional Case

We consider dynamic control of a make-to-order production system that serves price- and delay-sensitive customers. The production system is modeled as a multiclass queueing network where the customers'delay sensitivity is modeled via throughput-time constraints. To maximize her profit while meeting these throughput tim...

B. Ata, Chun Li · 0 citations
Open access Sep 2026

Modelling and performance analysis of a continuous ( R,s,S ) inventory model

This work aims to analyze an inventory system controlled by an ( R,s,S ) policy, whose stored product is described by a random continuous variable. We first propose to model the state of the considered system using a non-homogeneous discrete Markov chain (DMC) defined at inspection dates, without any restriction on...

Halima Khineche, M. Cherfaoui · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.