Oct 2026· Processes· Vol 14, pp. 3151· 0 citations· 32 references
Abstract
To address the trade-off between production efficiency and sustainable manufacturing, this study investigates the green flexible job shop scheduling problem (GFJSP) by simultaneously minimizing makespan and total energy consumption. An improved decomposition-based multi-objective evolutionary algorithm (IMOEA/D) is proposed. The algorithm integrates a hybrid initialization strategy combining heuristic dispatching rules and chaotic diversification, a two-layer encoding scheme, a stagnation-triggered memory archive, an objective-oriented variable neighborhood search (VNS), and dynamic neighborhood updating. The encoding and decoding procedures preserve schedule feasibility, while the memory archive and VNS enhance the search for high-quality solutions. Experiments are conducted on 18 Brandimarte, Hurink, and Kacem benchmark instances. Ablation analyses show the proposed components have different effects on makespan and energy consumption, reflecting the conflicting nature of the two objectives. Sensitivity analyses of the control parameter, initialization schemes, and stagnation threshold show the adopted configuration provides a stable balance between convergence performance, energy consumption, and search diversification across the tested instances. Compared with five representative multi-objective algorithms, IMOEA/D achieves an average improvement of 54.79% in Hypervolume (HV) and an average reduction of 69.93% in Inverted Generational Distance (IGD) against their overall averages. The results indicate that IMOEA/D provides an effective approach for deterministic bi-objective GFJSP optimization.
These findings demonstrate the effectiveness and adaptability of the proposed framework for energy-aware flexible job shop scheduling and show that the BLDMA framework achieves better non-dominated solution sets on the tested instances.
Jia-Yu Liu, Juin-Han Chen, Hai-Yang Liu et al.· International Journal of Ind...· 0 citations
This study proposes an enhanced artificial bee colony algorithm (ENABC) for flexible job shop scheduling with multiple assembly precedence constraints. The objective is to minimize the total penalty cost (TPC), defined as the sum of tardiness, earliness, flow time, and setup costs. ENABC enhances the classical artifici...
Naritsak Tuntitippawan, Watcharapan Sukkerd, W. Songserm et al.· International Journal of Kno...· 0 citations
This paper focuses on the cold chain logistics and proposes a multi-objective Vehicle Routing Problem (VRP) model that seeks to minimize the total cost of cold chain logistics and maximize the fairness of employees' workloads. This model first incorporates carbon emissions into the cost structure, and also discretely c...
Jian-Hao Xu, Zhuang Yang, Yang Wang· Evolutionary Computation· 0 citations
To address the challenges posed by the structural complexity and frequent resource conflicts in flexible job shop scheduling (FJSP) at practical power grid inspection bases, this paper formulates a makespan-minimization optimization model and proposes a dual-loop multi-strategy migrating birds optimization algorithm (D...
Lin Li, Tao Wang, Yong-Qiang Chen et al.· Algorithms· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.