PlantReliability Fusion Algorithm for Predicting Equipment and Structural Support Failures in Combined-Cycle Power Plants Using Operational and Structural Data Compared with Weibull Reliability Analysis

Sep 2026 · International Journal of Innovative Science and Research Technology · 0 citations · 35 references

Abstract

Combined-cycle power plants contain strongly coupled mechanical, thermal, electrical, and structural systems whose degradation mechanisms evolve under variable operating loads, cyclic thermal stresses, vibration, environmental exposure, and equipment ageing. Conventional reliability techniques such as Weibull reliability analysis are effective for estimating population-level failure distributions but have limited capability to incorporate high-frequency operational measurements, structural-condition indicators, nonlinear interactions, and time-varying degradation simultaneously. This study develops a novel PlantReliability Fusion Algorithm (PRFA) for integrated prediction of equipment and structuralsupport failures in combined-cycle power plants using operational and structural data. The proposed framework combines a temporal feature-learning module for processing equipment variables such as compressor discharge pressure, turbine exhaust temperature, vibration, bearing temperature, heat-recovery steam generator pressure, start-stop cycles, operating hours, and load fluctuations with a structural-condition module incorporating foundation settlement, support displacement, strain, vibration response, crack development, anchor-bolt condition, thermal expansion, and structural stress indicators. An attention-based multimodal fusion layer dynamically weights degradation signals from both data domains, while a reliability-learning layer estimates failure probability, hazard evolution, remaining useful life, and component reliability over time. PRFA is benchmarked against two-parameter Weibull reliability analysis, Cox proportional hazards regression, Random Forest, XGBoost, Long Short-Term Memory networks, and a conventional artificial neural network. Comparative performance is evaluated using accuracy, precision, recall, F1-score, area under the receiver operating characteristic curve, concordance index, Brier score, remaining-useful-life error, and computational efficiency. Graphical evaluation includes Weibull and predicted reliability curves, hazard-rate trajectories, receiver operating characteristic curves, predicted-versusobserved remaining useful life plots, structural-operational degradation maps, feature-importance plots, and comparative algorithm performance charts. The proposed fusion architecture is designed to provide stronger sensitivity to interacting mechanical and structural degradation mechanisms than conventional failure-time models or single-domain machinelearning approaches. The resulting framework provides a technically integrated basis for predictive maintenance, structural integrity management, inspection prioritization, outage planning, and lifecycle reliability optimization in combined-cycle power plants.

Read PDF

Similar papers

Open access Sep 2026

Predicting the Reliability of Industrial Enterprise Power Supply System Using Artificial Intelligence

Efficient management of the industrial electric power supply system operational reliability requires timely forecasting of the restoration time (MTTR, Тv) and the failure flow parameter (ω) for different voltage classes and equipment types. These values determine the damage from underproduction and make it possible to...

A. Malafeev, Yaroslav A. Zaitsev · 0 citations
Conference Open access Sep 2026

Predictive Linear Regression Model for Mechanical Vibrations in a 187 MW Gas-Turbine Generator Operating Under Combined Cycle

A gas turbine (GT) serves as the core component of a combined-cycle power generation system, consisting of a compressor, a turbine, and a generator that convert thermal energy into electrical energy. The rotating turbine is prone to mechanical vibrations, potentially leading to performance degradation or catastrophic f...

Ahmed Abed, Wei Ping Loh · 0 citations
Open access Oct 2026

A Study on Dynamic Analysis and Operational Optimization of an F-Class Combined-Cycle Power Plant Under Seasonal Load Conditions

With the increasing penetration of intermittent renewable energy, combined-cycle power plants are increasingly operated under frequent and deep load-following conditions. Under such conditions, transient irreversibility and its coupling with seasonal boundary changes cannot be adequately characterized by conventional s...

Xian-Yan Lin, Jing Hu, Ting-Ting Pan et al. · 0 citations
Review Oct 2026

Impacts of flexible operation on the service life of superheaters in heat recovery boilers: Analysis of creep–fatigue interaction in thermal power plants

This article investigates the impacts of flexible operation on Natural Gas-fired Combined-Cycle Power Plant (NGCCPP) equipped with Heat Recovery Steam Generator (HRSG), driven by the increasing integration of intermittent renewable energy sources into the power system. The objective is to assess the operational and str...

Eduardo dos Santos Piropo, Adonias Magdiel Silva Ferreira, A. P. Gonçalves · 0 citations
Open access Oct 2026

Fatigue life prediction and reliability assessment of fusion reactor liquid breeding blankets based on a stress-coupled corrosion model

Abstract The liquid breeding blanket is a critical component of magnetically confined fusion reactors, with corrosion fatigue induced by pulsed operation and the high-temperature lead-lithium environment constituting a primary failure mechanism. This study proposes a stress-coupled corrosion-fatigue life prediction and...

Guan-Nan Rong, Qing-Zhu Liang, Song-Lin Liu · 0 citations
Review Open access 2022

Advances in Predictive Maintenance of Industrial Boilers Using Condition Monitoring and Thermal Efficiency Analytics

Industrial boilers are capital-intensive assets whose unplanned outages carry severe consequences for production continuity, energy cost, and personnel safety. Traditional maintenance regimes, based either on running equipment to failure or on fixed calendar intervals, are increasingly unable to balance reliability aga...

Paul Chibuike Obetta, Nwakamma Ninduwezuor-Ehiobu, H. Olisakwe · 0 citations