· IISE Annual Conference & Expo 2025· 0 citations
Abstract
Designing system configurations is essential for ensuring the safety and efficiency, particularly in strategic sectors such as aerospace, and energy. Optimizing system configurations involves maximizing system availability while minimizing overall costs. This study focuses on the development of a feed water system (FWS) for heat-recovery steam-generator boilers used in combined cycle power plants in Iran. The process includes sourcing components from various suppliers, each offering different part characteristics and pricing, followed by installation at the power plant and subsequent utilization. The project is constrained by a deadline for installation and construction, with penalties incurred for project completion beyond this timeframe.This paper introduces a novel binary nonlinear fuzzy goal programming (FGP) model designed for the selection of part suppliers for multistate parallel-series industrial systems, considering both availability and manufacturing costs. The model incorporates factors such as quantity-based discounts, component purchase costs, and penalties for delays in system construction. Additionally, a fuzzy target programming approach is used to minimize deviations from the target expense goals. A system reliability block diagram is employed to represent the system's operational states—whether it operates at full capacity, partial capacity, or is non-operational. The Markov chain model is utilized to depict the sequence of possible states, where each state's probability is dependent on the reliability of the system components. The model also accounts for the impact of ordering multiple parts from the same supplier, which influences both economies of scale and delivery lead times.Results demonstrate the practical applicability of this approach in optimizing system reliability.
Optimizing equipment and transport utilization is a critical task in process planning. Traditional approaches are fragmented and lack a comprehensive hierarchy, leading to downtime and reduced efficiency. The disruption of interfunctional links requires the creation of a unified asset planning system across all operati...
O. Nurzhanova, I. Khrustaleva, V. Shkodyrev et al.· Frontiers of Mechanical Engi...· 0 citations
This study aims to develop a joint optimization model for production planning and preventive maintenance in a crude oil refinery. The purpose is to minimize total costs (production, storage, shortage and maintenance) while considering stochastic demand, a specified service level and equipment corrosion. It integrat...
L. Mifdal, Ibrahim Issoufou Djibo, Z. Hajej et al.· Management of environmental...· 0 citations
Purpose: The model allocates the system components orders to the suppliers to minimize the parts purchase costs, the system construction delay penalties, and maximize the system availability during its operations. It considers the quantity-based discount and variation of delivery lead time by ordering similar component...
Z. Sobhani, M. Shahrokhi· IISE Annual Conference &...· 0 citations
Multi-stage manufacturing systems require the highest possible level of availability. Due to the large batch size required for proper manufacturing, it is necessary to certify failure-free manufacturing time. Specific multi-stage machines must be characterized to calculate availability. Furthermore, preventive maintena...
F. J. Álvarez García, David Rodríguez Salgado, Ismael Caballero Muñoz-Reja et al.· DYNA· 0 citations
In this study, we present a new approach for the optimized scheduling of maintenance tasks in electric power distribution networks based on a classic optimization technique. The original mixed-integer non-linear programming model is linearized using the piecewise linearization technique, adopting a classical pseudo-dyn...
Marcelo G. Sebastiao, J. Mantovani· IEEE Access· 0 citations
Material Requirement Planning (MRP) is an important part of production management because it ensures the timely availability of materials while reducing costs and surplus inventory. This study introduces a Goal Programming (GP)-based optimization model for material planning in a furniture manufacturing company that pro...
N. Raut, Harshal Nemade· international journal of eng...· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.