Skip to content
Open access

Sistem Informasi Manajemen Proyek Menggunakan Metode Agile pada CV. Hasta Prima Consultan Berbasis Web

Aug 2026 · Adopsi Teknologi dan Sistem Informasi (ATASI) · Vol 5, pp. 77-85 · 0 citations

TL;DR

The results indicate that the developed system is able to improve operational efficiency, enhance team coordination, reduce data recording errors, and provide accurate information to support decision-making at CV Hasta Prima Consultan.

Abstract

The rapid development of information technology has encouraged organizations to adopt integrated information systems to improve operational effectiveness and efficiency. CV Hasta Prima Consultan, a company engaged in consulting and project implementation, still faces challenges in project management processes that are carried out manually, such as delays in information delivery, data duplication, recording errors, and limited real-time data access. This study aims to design and develop a web-based project management information system capable of integrating all project management processes, including planning, execution, monitoring, and reporting. The system development method used is Agile due to its flexibility and adaptability to user requirements. The system is designed to support project data management, task scheduling, progress monitoring, and structured real-time reporting. System testing is conducted using the black box method to ensure that each function operates in accordance with the expected specifications. The results indicate that the developed system is able to improve operational efficiency, enhance team coordination, reduce data recording errors, and provide accurate information to support decision-making. Therefore, the system is expected to improve the quality of project management at CV Hasta Prima Consultan.  

Read PDF

Similar papers

Open access Sep 2026

Perancangan Sistem Informasi Manajemen Aset Berbasis QR Code dengan Pendekatan Agile Scrum

The high complexity of asset management in the inflight catering industry, with diverse physical assets spread across various work areas, makes manual recording methods prone to data errors, inaccuracies, and an inability to track asset conditions and locations in real-time. This study aims to design and implement a QR...

I. G. K. Paramartha, Dewa Ayu Trisna Adhiswari Wedagama · 0 citations
#software testing Review Open access Sep 2026

Perancangan Sistem Informasi Reservasi dan Manajemen Kos-Kosan Berbasis Website Dengan Metode Agile

A web-based information system that integrates online reservations, room availability, tenant management, payment management, survey scheduling, and facility damage reporting is designed to support more efficient reservation and boarding house management at this scale.

Selestina Didi Irmaya, Afif Efendi · 0 citations
Open access Sep 2026

Perancangan Website Sistem Informasi untuk RRQ Arena Manado Menggunakan Agile Scrum

RRQ Arena Manado still relies on social media for information publication and online forms for tournament registration, leaving information, participant data, and administrative processes distributed across different platforms. This study aims to design and implement an information system website  that integrates publi...

Hans Christian Arief, Chriestie Montolalu, S. Ngangi et al. · 0 citations
Open access Sep 2026

Rancang Bangun dan Evaluasi Sistem Informasi Penerimaan Calon Karyawan Berbasis Web Menggunakan Arsitektur Model View Controller (MVC) pada PT. Pharos Indonesia

The employee recruitment process requires structured applicant data management so that recruitment activities can be carried out effectively, quickly, and accurately. At PT Pharos Indonesia, managing the employee recruitment process requires support from a web-based information system capable of integrating applicant d...

J. Juwari · 0 citations
Review Open access Sep 2026

Digitalisasi UMKM Bengkel melalui Sistem Booking Servis dan Monitoring secara Real-Time

Digital transformation is increasingly important for micro, small, and medium enterprises (MSMEs), including vehicle repair workshops that still rely on manual registration, queue management, service records, and communication of repair progress. This study aims to design and implement a web-based service booking and r...

Apriyanus Laia, Dadang Iskandar Mulyana, Mesra Betty Yel · 0 citations
Review Open access Aug 2026

RANCANG BANGUN BACK-END SISTEM INFORMASI CAPAIAN PEMBELAJARAN LULUSAN (CPL) MENGGUNAKAN LARAVEL

Higher education plays a strategic role in producing qualified graduates through outcome based curricula. However, at the University of Lampung, the calculation of Graduate Learning Outcomes (Capaian Pembelajaran Lulusan/CPL) has not been carried out systematically, making curriculum evaluation less optimal. This study...

Faniel Sianipar, Wahyu Eko S, Yessi Mulyani et al. · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.