The growing integration of renewable energy has intensified peak-shaving and frequency-regulation demands on hydropower systems, causing frequent load fluctuations and imposing stringent timeliness requirements on load distribution among cascade hydropower plants (LDCHP). Conventional methods such as dynamic programming (DP) face prohibitive computational costs, while intelligent optimization algorithms may suffer from instability and parameter sensitivity. To address this challenge, this study formulates LDCHP as a finite multi-stage state-space search problem, with station operating states represented as search nodes. A tailored A* algorithm is developed with three key components: an actual cost function based on energy-storage consumption induced by generation decisions along the searched path, a heuristic function based on an aggregated hydropower plant model to efficiently estimate remaining cost, and an adjacent-node expansion procedure enforcing operational constraints. The method is evaluated on a 96-period (15-min intervals) intra-day LDCHP problem using three cascade stations in the middle reaches of the Dadu River Basin, China, as a representative case study. Under a 50 m3/s discretization step, the A* algorithm achieves an average speedup of approximately 5,347 times compared with DP, while the cascade energy-storage consumption obtained by the A* algorithm is only 1.65% higher than that obtained by the DP algorithm under the same total generation requirement. These results suggest that the proposed method provides an efficient decision-support tool for short-term load distribution in cascade hydropower systems with similar dispatching characteristics.
Recently, transmission congestion remains a critical challenge in power systems, especially in deregulated markets. While Generation Rescheduling (GR) is the conventional approach for Congestion Management (CM), integrating Demand Response (DR) and Distributed Generation (DG) has also proven to offer system operational...
Van-Tuan Duong, L. Duong· IEEE Access· 0 citations
Accelerating variable renewable energy integration introduces substantial operational challenges to modern power grids. Frequent curtailment of surplus renewable generation highlights the pressing need for long-duration energy storage capable of shifting generation to high-demand periods while providing essential ancil...
L. R. Albuquerque, R. Kelman, Tarcisio Castro et al.· 1 citation
With the large-scale integration of distributed renewable energy and the increasing volatility of electric and gas loads, traditional deterministic models struggle to accurately characterize the dynamic response behavior of park-level energy systems. To address this issue, this paper proposes a multi-objective operatio...
W. Liu, Z. Song, L. Li et al.· Advanced Electromagnetics· 0 citations
High wind and photovoltaic (PV) penetration reshapes intra-annual residual energy demand and changes hydropower generation space and operating patterns. Conventional medium- to long-term scheduling methods struggle to coordinate renewable-energy integration, supply reliability, and seasonal hydropower utilization. This...
Tian-Cai Zuo, Rong Huang, Jiang-Long Zhu et al.· Water· 0 citations
The large-scale integration of electric vehicles (EVs) can increase load fluctuations, operating costs, and security risks in active distribution networks (ADNs). To address these challenges, this study proposes a multi-objective optimal scheduling strategy based on a Multi-Objective Dung Beetle Optimization (MODBO) al...
Ze-Sheng Hu, Kaikai Wang, Zhao-Rui Lu et al.· Processes· 0 citations
The optimal placement and power injection of photovoltaic (PV), wind, and battery energy storage system (BESS) units are critical for reliable microgrid operation under renewable-generation uncertainty. This study proposes a two-level planning-and-operation framework for a grid-connected microgrid. At the planning stag...