Skip to content

Author

Mbangu Kiama Archange

1 paper indexed here

We haven’t gathered this author’s papers yet. Follow them and we’ll fetch their work.

Not the right person? Other researchers publish under this name.

Open access Sep 2026

TECHNOLOGICAL DIAGNOSIS OF THE PERFORMANCE OF A 50 KW MICRO-HYDROPOWER PLANT INSTALLED ON THE LOSSO RIVER IN NGULA, KWILU PROVINCE (DRC)

Background: The Democratic Republic of the Congo has exceptional hydroelectric potential (approximately 100,000 MW), but access to electricity in rural areas remains very low (< 10%). Locally manufactured micro-hydropower plants are a promising solution, but their actual performance is poorly documented. This study aim...

Mbangu Kiama Archange, Cimbela Kasongo Joseph Gregoruis, Lema Nkwalu Blaise et al. · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.