Investigation into Combined AC–DC Insulation Stress Evolution Mechanism and Combined Withstand Voltage Test Method for 40.5 kV Capacitor Bank Circuit Breaker Breaks
With the large-scale construction of renewable energy collection stations and distribution networks, the frequent switching of 40.5 kV reactive power compensation capacitor banks has become a routine operation. To accurately evaluate the insulation safety risk at the breaker break during the switching process of 40.5 k...